
Case Study: Scaling an Engineering Team in Abu Dhabi E-commerce
An Abu Dhabi e-commerce company scaled from 5 to 40 engineers in 18 months. Learn how structured hiring enabled rapid growth without sacrificing quality.
The Challenge
An Abu Dhabi e-commerce company needed to scale their engineering team from 5 to 40 engineers in 18 months to support rapid business growth. They couldn't afford bad hires that would slow them down.
The Solution
They implemented structured hiring with role-specific assessments, decision-grade reports, and streamlined processes that enabled fast, quality hiring.
Results
- Scaled from 5 to 40 engineers in 18 months
- Bad hire rate: Only 8% (industry average: 45%)
- Time-to-productivity: 2 months (industry average: 3-4 months)
- Team satisfaction: High, with strong culture maintained
Key Success Factors
- Structured assessment process
- Clear role definitions
- Fast decision-making
- Strong onboarding
Conclusion
Structured hiring enabled rapid scaling without sacrificing quality. The company maintained high standards while growing quickly.